Smart Mariner Edition

ENGINEERING KNOWLEDGE, INSTRUMENTS & CONTROL SYSTEMS

FIRST MATE OF A FOREIGN GOING SHIP (PHASE – II)

 

FUNCTION: NAVIGATION (Management Level)

 

PAPER: ENGINEERING KNOWLEDGE, INSTRUMENTS & CONTROL SYSTEMS

TIME:  3 Hours                        PASS MARKS: 100                                     MAX. MARKS: 200

NOTES:
1. Question No. 1 is compulsory. Attempt any SEVEN questions from the remaining.
2. All questions carry equal marks.
3. Wherever applicable sketches should be drawn in support of the same.

Q1. NUMERICAL BASED ON FUEL CONSUMPTION/ INDICATOR DIAGRAM/ POWER OUTPUT/SLIP
Q2.MARINE ENGINEERING TERMS/ BOILERS
Q3. DISTILLATION AND FRESH-WATER SYSTEMS/ PUMPS AND PUMPING SYSTEMS
Q4. STEERING GEARS/ STABILISERS
Q5. GENERATORS, ALTERNATORS AND ELECTRICAL DISTRIBUTION
Q6. REFRIGERATION, AIR-CONDITIONING AND VENTILATION
Q7. SEWAGE TREATMENT PLANTS/ OILY-WATER SEPARATORS AND OIL FILTERING EQUIPMENT/ INCINERATORS
Q8. DECK MACHINERY/ HYDRAULIC SYSTEMS
Q9. DIESEL ENGINES/ STEAM TURBINE SYSTEMS/ PROPELLER AND PROPELLER SHAFT
Q10. BRIDGE CONTROL/ ENGINE ROOM WATCH KEEPING

Please note that the above format is only an indicative of the examination paper. The candidates are advised to refer to detailed teaching syllabus and the course outline.

Leave a Reply

Get A Quote